Kickstarter Board Game Manufacturing Checklist: MOQ, Samples & Timeline
Kickstarter board game manufacturer checklist: lock BOM before campaign, sample vs mass, MOQ from 200, timelines, freight, artwork files, and risk buffers.


Crowdfunding fails at the factory more often than at the pitch deck. Backers fund a promise; the factory needs a locked bill of materials (BOM), print-ready files, sample approval, and a calendar that includes freight—not only press days. This checklist is how Game Foundry Co., Ltd. (OEM-ODM board game manufacturer since 2011; a Shenzhen factory of approximately 30,000㎡) typically scopes Kickstarter / crowdfunding game printing so pledges, samples, and bulk ship on one timeline.
Packaging detail lives in the Custom Board Game Box & Insert Guide.
Card stock detail is in the Playing Card Stock Guide.
Production stages are on Our Process.
1. What to lock before you launch the campaign
Formats commonly accepted: PDF, AI, PSD, or high-resolution JPEG/PNG. Aim for ≥ 300 ppi at final size; keep 3–5 mm bleed on print parts. We can review print readiness (resolution, format, bleed) and sign an NDA when needed.
Before you call files “final”:
One folder per SKU (board, each deck, box lid, box base, insert, rules, tokens)
2. Correct dielines / templates for box wraps and inserts—not freehand rectangles
3. CMYK for process print; Pantone / foil / spot UV as separate plates
4. Pure black solids
Treat the campaign page as a manufacturing contract you will have to fulfill. Soft language on the page becomes hard tooling on the floor.
Lock before launch (or label as stretch / optional SKU):
1. Full BOM — every SKU in the box: board(s), decks, tokens, dice, miniatures, rules, box, insert, bags, stickers
2. Sizes and materials — L×W×H or trim size; grey board / card GSM+core / wood / metal / plastic as applicable
3. Edition map — Core / Deluxe / Add-on / Stretch: which components differ, and by how many units
6. Target quantity bands — pledge goal, expected fulfillment qty, and reprint trigger (e.g. 200 / 500 / 1,000 sets)
7. Sample plan — whether a physical prototype is approved before campaign end (recommended for new constructions)
8. Incoterms + destination(s) — EXW / FOB / DDP; single warehouse vs multi-country fulfillment
9. Stretch-reward rules — what is already tooled vs what needs a new quote and new timeline if funded
If a stretch adds a molded mini, metal coin, or custom insert cavity, that is a new project line, not a free upgrade. Put “subject to manufacturing feasibility and revised timeline” on the campaign if the part is not already sampled.
2. Sample vs mass: what each stage is for
- Stage: Digital / soft proof | Purpose: Check layout, type, dieline fit | Typical timing (after design/files confirmed)*: Hours–days | Do not use it to…: Judge shuffle feel, grey-board stiffness, or press color
- Stage: Physical sample / prototype | Purpose: Validate structure, materials, assembly, fit | Typical timing (after design/files confirmed)*: Sample production ~7 days; in hand often ~14 days incl. logistics | Do not use it to…: Assume CMYK bulk color is identical without a bulk-process sample
- Stage: Bulk / mass production | Purpose: Fulfill pledges | Typical timing (after design/files confirmed)*: Card games ~15 days; board games / puzzles ~20–25 days | Do not use it to…: Start before sample sign-off if construction is new to you
Crowdfunding rule of thumb: approve structure and materials on a physical sample before you freeze campaign copy that names exact stocks, finishes, and box style. Art can still iterate; the construction should not.
3. MOQ and quantity planning for Kickstarter
- Typical factory MOQ starts from 200 sets for game OEM.
- “Sets” = finished sellable/fulfillable units, not loose sheets.
- Dense BOMs (many unique tokens, custom molds, multi-fold boards, specialty finishes) may need a higher practical run than a compact card game—flag that in the RFQ.
- Quote at pledge bands: e.g. 200 / 500 / 1,000 so stretch success does not surprise unit cost.
- Unit cost usually falls as setup amortizes; jumping quantity often moves price more than a small art tweak.
Plan overprint / spoilage buffer (extra sets beyond confirmed pledges) for damage, replacement, press overs, and late address fixes. Agree the buffer percentage with the factory and your fulfillment partner before PO.
4. End-to-end timeline (build one calendar)
Do not schedule “factory 25 days” as fulfillment day. Stack stages:
- Block: A. Pre-campaign | What belongs here: BOM lock, option quotes, optional structure sample | Buffer tip: Leave time for one revision cycle
- Block: B. Campaign + late pledges | What belongs here: Final counts; freeze stretch that needs new tooling | Buffer tip: Cap late add-ons that change the BOM
- Block: C. File lock | What belongs here: Print-ready PDF/AI/PSD; dielines; Pantone/spot plates | Buffer tip: No “small text tweak” after lock without re-proof
- Block: D. Sample sign-off | What belongs here: Physical sample approve (or documented waive) | Buffer tip: Written approval before bulk materials are cut
- Block: E. Bulk production | What belongs here: ~15 days (cards) / ~20–25 days (board games) after lock | Buffer tip: Complexity and molds add time—get it in writing
- Block: F. Freight | What belongs here: Ocean often weeks to ~2 months; air faster/costlier | Buffer tip: Book lane early; peak seasons slip
- Block: G. Fulfillment | What belongs here: Warehouse receive, QC spot-check, pack-out | Buffer tip: Add days for customs if DDP / import broker
Sea freight for bulk is planned separately from factory production. If you promised a ship-by month on Kickstarter, reverse-plan from that month through F → E → D → C.
5. Freight and Incoterms (budget next to factory cost)
Manufacturing quotes typically exclude freight. Common terms we support discussion around: EXW, FOB, DDP.
- Mode: Ocean | Relative speed: Slowest (often weeks–~2 months by lane) | Relative cost: Lowest per unit at volume | Crowdfunding note: Default for full pledge runs
- Mode: Air | Relative speed: Fast | Relative cost: High | Crowdfunding note: Use for late add-ons, replacements, or small/urgent cartons
- Mode: Split | Relative speed: Mixed | Relative cost: Mixed | Crowdfunding note: Ocean for core; air for a safety carton of replacements
Confirm: carton specs, palletization, marks, destination warehouse appointments, and who owns duties/VAT. Put freight and duties into the campaign budget before you set shipping add-ons for backers.
6. Artwork and file package checklist
Formats commonly accepted: PDF, AI, PSD, or high-resolution JPEG/PNG. Aim for ≥ 300 ppi at final size; keep 3–5 mm bleed on print parts. We can review print readiness (resolution, format, bleed) and sign an NDA when needed.
Before you call files “final”:
1. One folder per SKU (board, each deck, box lid, box base, insert, rules, tokens)
2. Correct dielines / templates for box wraps and inserts—not freehand rectangles
3. CMYK for process print; Pantone / foil / spot UV as separate plates
4. Pure black solids as K:100% when that is the intent
5. Rules: final page count, paper stock, fold/bind method
6. Component list PDF matching the campaign edition map (Core vs Deluxe)
7. Version date in filenames; no “final_final_v3” ambiguity
8. If cards will be sleeved by backers, note sleeve allowance in box/insert wells
Missing bleed, RGB logos, or wrong dielines are the usual reasons sample timing slips after “files sent.”
7. Risk buffers (write them into the plan)
- Risk: Late art | What usually breaks: Bulk start slips → freight slips → ship-by miss | Buffer / control: Hard file-lock date; paid change order after lock
- Risk: Stretch molds | What usually breaks: New tooling + sample cycle mid-campaign | Buffer / control: Pre-quote stretch parts; or defer to a later wave
- Risk: Color expectation | What usually breaks: Soft proof ≠ press | Buffer / control: Physical sample; optional bulk-process color sample
- Risk: Quantity surge | What usually breaks: Materials / capacity / unit price change | Buffer / control: Pre-agreed price breaks at 200 / 500 / 1,000+
- Risk: Freight peak / congestion | What usually breaks: Extra weeks | Buffer / control: Ocean booking early; air contingency budget
- Risk: Damage / short ship | What usually breaks: Backer replacements | Buffer / control: Overprint % + spare carton air budget
- Risk: Multi-SKU editions | What usually breaks: Wrong insert / wrong deck in box | Buffer / control: Edition BOM table + QC checklist per SKU
- Risk: IP / licensing art | What usually breaks: Hold on print | Buffer / control: Clear rights before files go to plate
Honest factory planning assumes at least one revision cycle and freight uncertainty. Campaigns that publish a ship month without sample + ocean buffer are the ones that write apology updates.
8. Numbered pre-campaign manufacturing checklist
Copy into your project doc:
1. BOM complete (all SKUs, sizes, materials)
2. Edition matrix (Core / Deluxe / Add-ons / Stretches)
3. Box style + insert type chosen or option-quoted
4. Card stock (GSM+core or PVC) option-quoted
5. MOQ path clear — start from 200 sets; get 500 / 1,000 breaks
6. Sample needed? If yes, schedule before campaign copy freezes construction claims
7. Rough calendar: sample → bulk → freight → fulfillment → ship-by
8. Incoterms + primary destination warehouse
9. Freight mode + contingency (ocean default / air backup)
10. Overprint / replacement buffer agreed
11. File formats and dielines assigned to artists
12. NDA if required before sharing files
13. Stretch rewards tagged “tooled” vs “needs new quote”
14. RFQ sent with the four quote inputs: components, qty each, size each, material each
9. RFQ template (send to the factory)
Use Contact Us (https://www.gamefoundry.hk/contact-us). A usable first quote needs:
1. Product components
2. Quantity of each component
3. Size of each component
4. Material for each component
5. Target set quantity (from 200 sets up) + optional 500 / 1,000 breaks
6. Sample needed? Y/N
7. Preferred Incoterm + destination
8. Campaign ship-by month (aspirational vs hard)
9. Files or sketches if ready
We quote options (two card stocks, paper vs foam insert, etc.) rather than one opaque “Kickstarter price.” Align the campaign page to the option you actually approve.
10. Related reading on Game Foundry
- Our Process (https://www.gamefoundry.hk/process) — quote → design check → sample → bulk → shipping
- Contact Us (https://www.gamefoundry.hk/contact-us) — send the RFQ / NDA request
Bottom line for crowdfunding game printing: lock the BOM and construction before the campaign sells them; sample before bulk; treat freight and buffers as part of manufacturing—not as an afterthought after the pledge total posts.
